Reliability Analytics Corporation
Previous | Next      Search Home

First 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Last

First 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Last

Previous | Next      Search Home

HIL-5 TD-217 3(AS) CONTENTS Page Paragraph 1. SCOPE 1 1.1 Purpose 1 1.2 Application 1 1.3 Logistics Support Analysis, Reliability-Centered Maitenance 1 1.4 Reliability-Centered Maintenance program 1 2. REFERENCED DOCUMENTS 2 2.1 Government documents 2 2.1.1 Specifications, standards, and handbooks 2 2.1.2 Other Government documents, drawings, and publications 3 2.2 Other publications 3 2.3 Order of precedence 4 3. DEFINITIONS 5 3.1 Definition of terms 5 3.2 Definition of acronyms 13 4. GENERAL REQUIREMENTS 15 4.1 MPA and RCM interface 15 4.2 RCM analysis process 15 4.2.1 Determining significant items 17 4.2.1.1 Functional breakdown 17 4.2.1.2 Significant item selection 20 4.2.2 Failure modes and effects analysis 20 A.2. 3 RCM decision logic 21 4.2.3.1 Determining failure consequences 21 4.2.3.2 Evaluation of proposed tasks 21 a.2 U Default decision logic 21 4.2.5 Development of age exploration tasks 25 4.3 Kinds of preventive maintenance 25 4.3.1 Applicability and effectiveness of preventive maintenance tasks 26 4.3.2 Servicing and lubrication tasks 26 4.3.3 On-condition tasks 28 4.3.4 Hard time tasks 28 4.3.4.1 Rework tasks 28 4.3.4.2 Discard tasks 29 4.3.4.2.1 Safe life limits 29 4.3.4.2.2 Economic life limits 29 4.3.5 Combination tasks 30 4.3.6 Scheduled failure finding tasks 30 4.4 RCM for different types of equipment 30 vi Source: http://www.assistdocs.com -- Downloaded: 2013-02-28T13:44Z Check the source to verify that this is the current version before use.

Toolkit Home

Reliability Analytics Corporation
reliabilityanalytics.com